FlowMotion Trail Builders, LLC
About FlowMotion Trail Builders, LLC
William Preston York (General Contractor)
FLowMotion Trail Builders, LLC GC #53560
75 Scarbrough Ln, Anniston, AL 36207 256-591-5506
William Preston York, MBA is the owner/operator of FlowMotion Trail Builders LLC, located in Anniston, AL. FlowMotion has been a professional trail building entity for over 11 years and is a licensed General Contractor in Alabama with a $3,000,000 bid limit, specializing in Recreational Trail Construction. During this period, I have constructed 25 Trail Systems and performed Multi-Use trail design and construction of over 200 miles in 37 unique locations in 5 states.
As a Licensed General Contractor, I have been awarded numerous RTP-funded, public-bid contracts for Shared Use/Bike Optimized trails totaling over $3,000,000.00.
I have worked directly with IMBA Trail Solutions on 5 trail construction projects. I also have worked with multiple SORBA chapters in Alabama, Georgia and Tennessee, the County of Shelby, AL, Montevallo University, City of Anniston, City of Gadsden, City of Dothan, City of Cullman, City of Jackson GA, White County, GA, Alabama State Lands, Oak Mountain State Park, Chewacla State Park, Guntersville State Park, Turkey Creek Nature Preserve, Tannery Knobs, Johnson City TN, and the Army Corp of Engineers, GA, and Dauset Nature Trails, GA.
My sole-source trail contracts total over $3,000,000.00 that represent the non-RTP funded municipal projects and the private sector.
As an IMBA Trail Solutions Sub Contractor 7 years ago, I began working on the Newly World-Famous Bronze-Level Coldwater Mountain Bike Trail System where I received training and worked directly with IMBA Trail Solutions. I have been involved at some level in every aspect of the creation of CWM, from concept to construction to long-term maintenance. Long before IMBA became involved, I was the volunteer NEABC Trail Czar, and later the Executive NEABA/SORBA Trails Director.
As a Landscaping Business owner, I have performed commercial and residential landscape design and construction, private road, home site, underground utilities, bridge construction, engineered wall construction, large-scale erosion control, grading and excavating, irrigation design and installation as well as forestry mulching. As an owner of an Engineering/Fabrication company, I designed and manufactured components for the Army's wheeled-vehicle division.
FlowMotion constructed the 1st purpose-built Alabama NICA/ACA race venue trail system at McCLellan in my hometown of Anniston. We also built a NICA/ACA-Race trail system at Black Creek Trails at Noccalula Falls in Gadsden, as well as the 1st Collegiate MTB XCO Race Course and ACA race course at the University of Montevallo, Additionally, we built the 1st purpose-built Georgia NICA/GCA race venue at Kingston Downs in Rome, GA as well as a race venue trail system at Yonah Preserve in Cleveland, GA.
I’ve installed THOUSANDS of square feet of rock armoring, creek crossings, trail retainer walls and black diamond rock features. I have built dozens of large berm turns, hundreds of rollers, in-sloped turns, grade reversals, step ups, drop-ins and tables. I have designed, flagged, built, signed and mapped several complete trail systems in widely different geological areas in the South. I talk terrain and I know the FLOW…the flow of the trail, the rider and the water. I build fun trails that are safe and sustainable. I work closely with the Owner and land manager as well as the Local SORBA Chapters and riders to ensure the finished product is exactly what the end user desires.
I specialize in NICA compliant trails, tight and technical, Flow trail, gravity trail, jump lines, rock armoring and alternate features, water crossings, Green, Blue and Black sweet single track!
Products & Services
Equipment that we own!!
Having the right tool for the job is important, therefore we OWN EVERTHING WE NEED!! I am a mechanical engineer with a full-service fabrication shop and maintain and repair all my equipment:
- Sweco 300 Trail Dozer 29” wide 4400lb 45hp Diesel
- Sweco 500 Trail Dozer 48” wide 9000lb 75hp Diesel
- Cat 302 with Engcon
- Cat 301.7 with Steelwrist
- Asv 75 HD all-terrain rubber tracked skid steer loader with forestry mulcher, grapple bucket, 4-way grading bucket
- Vermeer S925TX Mini Skid Steer with a 6-Way Dozer Blade,4-way grading bucket, and plate compactor
- Vermeer CT100 Mini Skid Steer
- Intimidator sxs with dump bed, Suzuki 500 quad
- Cannycom Rubber tracked C160 and SC75mini dumper,
- Hurricane 35hp zeroturn blower
- 2022 F350
- 2020 F450
- 32ft gooseneck
- 14,000lb dump trailer and 14,000lb equipment trailer
PICTURES
Company Contact
preston york |
flowmotiontrailbuilders@gmail.com |
256-591-5506 |
www.flowmotiontrailbuilders.com |
75 Scarbrough Ln |
Anniston |
AL |
US |
36207-4306 |